rss
Eur J Hosp Pharm doi:10.1136/ejhpharm-2012-000272
  • Research
  • Original article

Validation of a once-a-week set up for an automated compounder device for parenteral nutrition solutions

  1. Pascal Bonnabry1,2
  1. 1Service of Pharmacy, University Hospitals of Geneva, Geneva, Switzerland
  2. 2School of Pharmaceutical Sciences, University of Geneva, University of Lausanne, Geneva, Switzerland
  1. Correspondence to Dr Lucie Bouchoud, Service of Pharmacy, Geneva University Hospitals, Gabrielle Perret-Gentil 4, 1211 Geneva 14, Switzerland; lucie.bouchoud{at}hcuge.ch
  • Received 18 December 2012
  • Revised 8 March 2013
  • Accepted 12 March 2013
  • Published Online First 26 April 2013

Abstract

Background Setting up an automated compounder device (ACD) takes time and money. Daily production of paediatric parenteral nutrition (PN) solutions in our pharmacy decreased after implementing standard PN for neonatology. To keep the production of a limited number of PN bags cost effective, we wished to set up the ACD weekly rather than daily.

Objectives This study aims to validate (operational and performance qualification (PQ)) use of an ACD (Baxa MM12) for once-a-day and once-a-week set up.

Methods Accuracy and precision of the ACD were evaluated using water (operational qualification) on a daily basis, and using the products for preparing PN solutions (PQ) on a daily and a weekly basis. Nutrient dosage was measured for specific PN solutions after daily or weekly ACD set ups. Particle contamination of PN solutions produced were controlled throughout the week. To validate the aseptic process, media-fill tests of the once-a-week set ups were carried out over three consecutive weeks.

Results Accuracy and precision of the ACD were validated for small (0.5 ml) and high (100 ml) volumes. Precision improved when pumped volumes increased. Nutrient dosage in PN solutions following daily and weekly set ups were always in conformity with specification limits. No particles or microbiological contaminations were detected following the week-long set ups.

Conclusions Validation proved good accuracy, precision and aseptic conditions existed throughout each week. PN solutions can be produced safely all week long with one set up. A week-long set up saves technician time and money.

EJHP blog

Analysis and discussion of the latest news, research findings and policy developments in hospital pharmacy.

Visit the blog >>

Free Sample

This recent issue is free to all users to allow everyone the opportunity to see the full scope and typical content of EJHP.

View free sample issue >>

Email alerts

Don't forget to sign up for content alerts so you keep up to date with all the articles as they are published.

Navigate This Article